THE MELEN BASIN ENVIRONMENTAL PROTECTION


In the scope of this work, three advanced wastewater treatment plant projects have been prepared. All treatment plants have MBR technology to treat wastewater. Kaynasli and Cumayeri districts have 5500 m³/day, Yigilca has 2500 m³/day treatment capacities.
In summary;

  • 2 pcs capacity of 5500 m³/day advanced wastewater treatment plants
  • 1 pcs capacity of 2500 m³/day advanced wastewater treatment plant
  • Flood control structures
  • Discharge structures
  • and supervision of construction.

services have been served.

  • Lokasyon: Duzce, TURKEY
  • Category: Water & Hydraulics
  • Investor: Istanbul Water and Sewerage Administration (ISKI)
  • Etiketler: Wastewater, Treatmen Plant, Melen, Duzce

Sitemizde sunulan özelliklerin ve sitenin işleyişi için bazı çerezlerin kullanılması teknik olarak zorunludur. Diğer bazı çerezler de sitemizi geliştirmek ve bizim tarafımızdan veya yetkili hizmet sağlayıcılarımız tarafından size ilgi alanınıza göre reklamların sunulması amacıyla kullanılmaktadır. Detaylı bilgi için Gizlilik Sözleşmesini inceleyebilirsiniz.