Within the scope of the tender which was organized by Sakarya Water and Sewerage Administration, preparation of transmission line and network projects in order to fulfill the drinking water needs of various neighborhoods connected to Hendek from Uludere Resources until the year of 2055.
In order to be able to feed some of the districts of Hendek District and its connected areas, raw water will be transferred to the planned treatment facility by gravity from Uludere Resources. The treated drinking water will be transferred to the planned or existing reservoirs at the relevant points according to the pressure zoning area. Pumping stations or booster systems were designed for parts that which cannot be transferred by gravity. In order to distribute the water which was provided, the network system planning was made to all relevant regions.
Summary;
Sitemizde sunulan özelliklerin ve sitenin işleyişi için bazı çerezlerin kullanılması teknik olarak zorunludur. Diğer bazı çerezler de sitemizi geliştirmek ve bizim tarafımızdan veya yetkili hizmet sağlayıcılarımız tarafından size ilgi alanınıza göre reklamların sunulması amacıyla kullanılmaktadır. Detaylı bilgi için Gizlilik Sözleşmesini inceleyebilirsiniz.