Within the scope of the tender which was organized by Sakarya Water and Sewerage Administration, preparation of transmission line and network projects in order to fulfill the drinking water needs of various neighborhoods connected to Hendek from Uludere Resources until the year of 2055.
In order to be able to feed some of the districts of Hendek District and its connected areas, raw water will be transferred to the planned treatment facility by gravity from Uludere Resources. The treated drinking water will be transferred to the planned or existing reservoirs at the relevant points according to the pressure zoning area. Pumping stations or booster systems were designed for parts that which cannot be transferred by gravity. In order to distribute the water which was provided, the network system planning was made to all relevant regions.
Summary;
This website stores cookies on your computer. These cookies are used to collect information about how you interact with our website and allow us to remember you. We use this information in order to improve and customize your browsing experience and for analytics and metrics about our visitors both on this website and other media. To find out more about the cookies we use, see our Privacy Policy.