WATER SUPPLY DESIGN PROJECT OF AMASYA


Within the scope of the tender which was organized by DSI 7th Region, preparation of transmission line projects to fulfill the drinking water requirements of Amasya Merkez District until the year of 2055.

Within the scope of work; water was supplied from two different points. Değirmendere Pond and Kırkgöz Resources are the water supply points of this project. The raw water, which is taken from Değirmendere Pond, after being treated, will be transferred to the existing Kirazlıdere Reservoir. Kırkgöz Resources is the water supply point which consists of many large and small aquifers. A special water intake structure was designed to collect these aquifers in a single point and isolate them from the creek. The collected raw water will be transferred to the planned treatment plant with the pressurized line. The treated drinking water will also be transferred to the balancing tank with the pressurized line and then to the 5000 m³ planned Hizirpasa Reservoir via by gravity.

In summary; 2 conventional package treatment plants, 2 reservoirs, 2 pumping stations, 1 water intake structure, 42 km transmission line and related engineering structures, bridge and creek transition details, expropriation plans, approximate cost, and tender documents were prepared.

  • Category: Water & Hydraulics

Sitemizde sunulan özelliklerin ve sitenin işleyişi için bazı çerezlerin kullanılması teknik olarak zorunludur. Diğer bazı çerezler de sitemizi geliştirmek ve bizim tarafımızdan veya yetkili hizmet sağlayıcılarımız tarafından size ilgi alanınıza göre reklamların sunulması amacıyla kullanılmaktadır. Detaylı bilgi için Gizlilik Sözleşmesini inceleyebilirsiniz.