WATER SUPPLY DESIGN PROJECT OF AMASYA


Within the scope of the tender which was organized by DSI 7th Region, preparation of transmission line projects to fulfill the drinking water requirements of Amasya Merkez District until the year of 2055.

Within the scope of work; water was supplied from two different points. Değirmendere Pond and Kırkgöz Resources are the water supply points of this project. The raw water, which is taken from Değirmendere Pond, after being treated, will be transferred to the existing Kirazlıdere Reservoir. Kırkgöz Resources is the water supply point which consists of many large and small aquifers. A special water intake structure was designed to collect these aquifers in a single point and isolate them from the creek. The collected raw water will be transferred to the planned treatment plant with the pressurized line. The treated drinking water will also be transferred to the balancing tank with the pressurized line and then to the 5000 m³ planned Hizirpasa Reservoir via by gravity.

In summary; 2 conventional package treatment plants, 2 reservoirs, 2 pumping stations, 1 water intake structure, 42 km transmission line and related engineering structures, bridge and creek transition details, expropriation plans, approximate cost, and tender documents were prepared.

  • Category: Water & Hydraulics

This website stores cookies on your computer. These cookies are used to collect information about how you interact with our website and allow us to remember you. We use this information in order to improve and customize your browsing experience and for analytics and metrics about our visitors both on this website and other media. To find out more about the cookies we use, see our Privacy Policy.