DESIGN PROJECTS OF WASTEWATER NETWORK, COLLECTOR AND MICROTUNNEL IN NARDARAN AND BILGAH TOWNS IN THE ABSHERON PENINSULA


It is the design of the system for the removal of the wastewater of the towns in the Absheron Peninsula.

Within the scope of this work; analysis was done for each site in the wastewater collection basin. In addition, regions that will be expected to be located in the future were also included in the system. In order to transfer the collected wastewaters to the wastewater treatment plant which were determined in the master plan, pumping stations, pressurized lines, collectors, network lines, micro tunnel projects, and expropriation plans were prepared. A total of 320 km of collector system was planned.

  • Category: Water & Hydraulics

This website stores cookies on your computer. These cookies are used to collect information about how you interact with our website and allow us to remember you. We use this information in order to improve and customize your browsing experience and for analytics and metrics about our visitors both on this website and other media. To find out more about the cookies we use, see our Privacy Policy.