Stormwater Design Project of Altinordu
- Category
- Water & Hydraulics
- Project type
- Stormwater Drainage Design Project
- Location
- Ordu, Türkiye
Preparing rainwater drainage projects of the area between the Civil and Melet Rivers of Altinordu District of Ordu.
Within the scope of this work; basin analysis was performed in the residential areas between the two rivers and the drainage basin was prepared. The designated drainage basin was detailed by dividing into the sub-basins. The necessary facilities (grids, traps, network and collector lines) were designed to make the drainage of the entire basin, efficiently. In addition to the design works, tender documents and the approximate cost studies for the construction tender were also carried out.