Within the scope of the tender which was organized by DSI 5th Regional Directorate, the raw water was taken from Karadere Regulator will be combined with the raw water which was taken from the planned Cele Dam and will be delivered to the existing drinking water treatment plant in Bolu Merkez via 13.6 km pipeline. In summary; approximate cost and tender documents were prepared for the final design and construction tender of the transmission lines and engineering structures.