Within the scope of the tender which was organized by the 24th Regional Directorate of State Hydraulic Works (DSI), raw water gathered with the water intake structure which was planned in the Kagizman Dam, to be treated in the planned drinking water treatment plant and will be delivered to the existing reservoir in the Kagizman District Center via a 30 km transmission line. In summary; water intake structure, transmission lines, engineering structures and drinking water treatment plant final designs, approximate cost and tender documents for the construction tender were prepared.
This website stores cookies on your computer. These cookies are used to collect information about how you interact with our website and allow us to remember you. We use this information in order to improve and customize your browsing experience and for analytics and metrics about our visitors both on this website and other media. To find out more about the cookies we use, see our Privacy Policy.